• Our team is looking to connect with folks who use email services provided by Plesk, or a premium service. If you'd like to be part of the discovery process and share your experiences, we invite you to complete this short screening survey. If your responses match the persona we are looking for, you'll receive a link to schedule a call at your convenience. We look forward to hearing from you!
  • The BIND DNS server has already been deprecated and removed from Plesk for Windows.
    If a Plesk for Windows server is still using BIND, the upgrade to Plesk Obsidian 18.0.70 will be unavailable until the administrator switches the DNS server to Microsoft DNS. We strongly recommend transitioning to Microsoft DNS within the next 6 weeks, before the Plesk 18.0.70 release.
  • The Horde component is removed from Plesk Installer. We recommend switching to another webmail software supported in Plesk.

Backup task finished alert every 30 minutes

X

xmuskrat

Guest
For three days now, I'm getting alerts every 30 minutes.

--

Backup task finished.

Task was created by with guid (f2f76e8b-fe3a-4f02-ad30-59385e79950d)

Creation date is: 2010-Nov-21 16:35:01

--

My backup is stalled. There is no way in the control panel to abort the stalled backup.
 
Is there a way for me to cancel an in-process backup that's stuck?
 
It has happened to me twice.
Logged in as root in SSH and typed 'top ic' command.
The stuck process shows almost inmediately usually with hundreds of minutes in time process.
From there type the PID number to kill the process or if you prefer type 'kill -9' followed by the PID number.

good luck
 
I am also facing same issue. I am getting mail reminder about backup fail status, but i am using windows plesk 9.5.2 version. How to disable this.

regards
steve
 