• Our team is looking to connect with folks who use email services provided by Plesk, or a premium service. If you'd like to be part of the discovery process and share your experiences, we invite you to complete this short screening survey. If your responses match the persona we are looking for, you'll receive a link to schedule a call at your convenience. We look forward to hearing from you!
  • We are looking for U.S.-based freelancer or agency working with SEO or WordPress for a quick 30-min interviews to gather feedback on XOVI, a successful German SEO tool we’re looking to launch in the U.S.
    If you qualify and participate, you’ll receive a $30 Amazon gift card as a thank-you. Please apply here. Thanks for helping shape a better SEO product for agencies!
  • The BIND DNS server has already been deprecated and removed from Plesk for Windows.
    If a Plesk for Windows server is still using BIND, the upgrade to Plesk Obsidian 18.0.70 will be unavailable until the administrator switches the DNS server to Microsoft DNS. We strongly recommend transitioning to Microsoft DNS within the next 6 weeks, before the Plesk 18.0.70 release.
  • The Horde component is removed from Plesk Installer. We recommend switching to another webmail software supported in Plesk.

migration stalls at deployment phase after upgrade to Plesk 10.4.4

fran@

Basic Pleskian
I upgraded this Plesk server from Plesk 10.2.0 Feb. 2d 2012, to fix the SQL injection in the Plesk API.
The upgrade went well. Theserver is Plesk 10.4.4, MU#16

Yesterday was the first time I attempted to migrate a customer from a Plesk 9.5.4 server to this server since it's been upgraded to 10.4.4.
The migration started well:
- Retrieving information from host psa104.his.com... This may take a while, please wait.
Result: connected to source server OK
- selected objects to move: 1 resellet, 2 domains (75MB total, no email accounts)
- mapped IP addresses
- migration started, collected and imported info from source server, but stalled at deployment (75%).
I stopped and cancelled the migration after 2 hours.

I attempted to migrate another account (1 customer,1 domain ) to this server: same result: migration never completed nor returned an error, stalled at 75%.

Clicking on Stop has no effect.
I can only
I attempted to migrate those same accounts to a Plesk 9.5.4 server, the migration completes in 10 minutes.
I attempted to move those same accounts to another Plesk 10.4.4 server, they completed without error.

However, i need to transfer these domains onto this very specific server.
Let me know if you have any idea.
There are no errors returned in the PMM logs as far as I see.

I checked MU#17 and #18, they do not seem to address this issue.

Any ideas?

/Fran
 
I had several problems migrating from 10.3 to 10.4.4 (changing from a damaged server), basically on domains with subdomains or applications installed (aps catalog).
I end up migrating those manually.
 
Back
Top