• Our team is looking to connect with folks who use email services provided by Plesk, or a premium service. If you'd like to be part of the discovery process and share your experiences, we invite you to complete this short screening survey. If your responses match the persona we are looking for, you'll receive a link to schedule a call at your convenience. We look forward to hearing from you!
  • The BIND DNS server has already been deprecated and removed from Plesk for Windows.
    If a Plesk for Windows server is still using BIND, the upgrade to Plesk Obsidian 18.0.70 will be unavailable until the administrator switches the DNS server to Microsoft DNS. We strongly recommend transitioning to Microsoft DNS within the next 6 weeks, before the Plesk 18.0.70 release.
  • The Horde component is removed from Plesk Installer. We recommend switching to another webmail software supported in Plesk.

Update problem

WebProject

New Pleskian
Hello all,
i have a problem with update. I try to reboot the system but the error still return.

System Overview
  • OS: Microsoft Windows Server 2012 R2
  • Plesk version: 12.0.18 Update #65 , last updated at Sept 17, 2015 02:30 AM
The error is:

Execution failed.
Command: ai.exe
Arguments: Array
(
[0] => --select-product-id
[1] => panel
[2] => --select-release-current
[3] => --upgrade-installed-components
)

From two days i receive the email log with this message:

Details: BUSY: Update operation was locked by another update process.

PleskUtilException: "C:\Program Files (x86)\Parallels\Plesk\/admin/bin/ai.exe" --select-product-id panel --select-release-current --upgrade-installed-components failed with message: BUSY: Update operation was locked by another update process.
file: C:\Program Files (x86)\Parallels\Plesk\admin\plib\common_func.php3
line: 150
code: 0
trace: #0 C:\Program Files (x86)\Parallels\Plesk\admin\plib\common_func.php3(95): util_exec('ai.exe', Array, 'autoinstallerUp...', 'C:\\Program File...')
#1 C:\Program Files (x86)\Parallels\Plesk\admin\plib\Os.php(91): smart_exec('ai.exe', Array, 'autoinstallerUp...')
#2 C:\Program Files (x86)\Parallels\Plesk\admin\plib\Os.php(103): Os::exec('ai.exe', Array, 'autoinstallerUp...')
#3 C:\Program Files (x86)\Parallels\Plesk\admin\plib\CommonPanel\Update\Autoinstaller.php(136): Os::execEx('ai.exe', Array, 'autoinstallerUp...')
#4 C:\Program Files (x86)\Parallels\Plesk\admin\plib\CommonPanel\Update\Task.php(119): CommonPanel_Update_Autoinstaller->upgradeInstalledComponents()
#5 C:\Program Files (x86)\Parallels\Plesk\admin\plib\Db\Table\Broker\LongTasks.php(235): CommonPanel_Update_Task->run()
#6 C:\Program Files (x86)\Parallels\Plesk\admin\plib\Db\Table\Broker\LongTasks.php(153): Db_Table_Broker_LongTasks->_syncStart(Object(Db_Table_Row_LongTask))
#7 C:\Program Files (x86)\Parallels\Plesk\admin\plib\Db\Table\Broker\LongTasks.php(86): Db_Table_Broker_LongTasks->_startQueue(Object(Db_Table_Row_LongTask), true)
#8 C:\Program Files (x86)\Parallels\Plesk\admin\plib\CommonPanel\Update\Task.php(65): Db_Table_Broker_LongTasks->start(Object(Db_Table_Row_LongTask), 'synchronously')
#9 C:\Program Files (x86)\Parallels\Plesk\admin\plib\CommonPanel\Update\Daily.php(40): CommonPanel_Update_Task::startSynchronousUpdate()
#10 C:\Program Files (x86)\Parallels\Plesk\admin\plib\DailyMaintainance\Task\InstallUpdates.php(30): CommonPanel_Update_Daily->installUpdates()
#11 C:\Program Files (x86)\Parallels\Plesk\admin\plib\DailyMaintainance\Runner\Task.php(26): DailyMaintainance_Task_InstallUpdates->run(Array)
#12 C:\Program Files (x86)\Parallels\Plesk\admin\plib\DailyMaintainance\task-script.php(14): DailyMaintainance_Runner_Task->run()
#13 {main}

DEBUG [util_exec] [5605e695bc249] Starting: send-error-report warning
DEBUG [util_exec] [5605e695bc249] Finished in 0.00684s, Result: TRUE
DEBUG [panel] Autoinstaller has finished with error: Execution failed.
Command: ai.exe
Arguments: Array
(
[0] => --select-product-id
[1] => panel
[2] => --select-release-current
[3] => --upgrade-installed-components
)

Details: BUSY: Update operation was locked by another update process.
DEBUG [util_exec] [b3170dc603da9668a5c66fd2e12f9d35][0] Starting: serverconf --list, stdin:
DEBUG [util_exec] [b3170dc603da9668a5c66fd2e12f9d35][0] Finished in 0.08051s, Error code: 0, stdout: PLATFORM: windows
PRODUCT_ROOT_D: C:\Program Files (x86)\Parallels\Plesk\
PRODUCT_DATA_D: C:\Program Files (x86)\Parallels\Plesk\
HTTPD_VHOSTS_D: C:\Inetpub\vhosts\
TMP_D: C:\Windows\Temp
, stderr:
DEBUG [util_exec] [f50f41ec8e01152193a6322e09e7d282][0] Starting: usermng --isquotable, stdin:
DEBUG [util_exec] [f50f41ec8e01152193a6322e09e7d282][0] Finished in 0.09477s, Error code: 0, stdout: 0
, stderr:
DEBUG [panel] Panel database reconnected
DEBUG [panel] Log file is stored in persistent cache entry with ID '0d3600ce-91c0-2210-52ef-f52af8db77e0'
DEBUG [panel] Log file ID stored as task params
DEBUG [panel] Email notification has been sent
ERR [panel] Task failed: id=575, pid=4600, type=panel-update, error=Execution failed.
Command: ai.exe
Arguments: Array
(
[0] => --select-product-id
[1] => panel
[2] => --select-release-current
[3] => --upgrade-installed-components
)

Details: BUSY: Update operation was locked by another update process.
DEBUG [panel] Updates installation finished
INFO [panel] == End Installation of updates
 
Hi WebProject,

did you have a look at the sticky thread:



It is mentioned, that a lot of issues/problems/questions are already answered and in your case, your error message states:

Details: BUSY: Update operation was locked by another update process.

Using the KB - search option at : http://kb.odin.com/
... with the keyword "BUSY: Update operation was locked by another update process", will lead to the KB - article:

Did you try to kill the running process and did you then try to restart autoinstaller?
 
Back
Top